Transmission System Interconnection Information

Entities (such as wind farms and other independent power generators) interested in interconnecting to CWLP's transmission system can find information needed to assist them in this process on the Midwest Independent Transmission System Operator (MISO) website. This information includes CWLP's Planning Criteria and CWLP's Interconnection Procedures.
 

The CWLP Planning Criteria
The CWLP Planning Criteria, which has been developed to accurately assess the utility's transmission system, provides a guide for CWLP engineers, as well as entities that are requesting interconnection with the CWLP system. The criteria in this document are unconditional and provide the standards on which CWLP's transmission system is planned.

1. Access the CWLP Planning Criteria.

Note: To open the Planning Criteria document, your computer will need to be equipped with Adobe Acrobat or Adobe Acrobat Reader. For a free download of the most recent version of Acrobat Reader, click on this icon: This is the Get Acrobat Reader logo. Clicking on it will take you to the Adobe website, where you'll be able to download a free copy of the latest version of Acrobat Reader.

2. After reading the document, if you have questions or would like additional information, contact the CWLP Supervisor of Electric Planning:
by mail or
in person at:
1008 E. Miller St.
Springfield, IL 62702
by phone: (217) 321-1392

 

 
The CWLP Interconnection Procedures
The CWLP Interconnection Procedures have been developed by the CWLP Planning Department to assist entities wishing to interconnect their new or modified transmission facilities or generators with the City of Springfield (CWLP) transmission system. Transmission facilities are considered to be those that are 138 kV or higher or that provide 69 kV networked interconnection.

NOTE: Facilities of a lower voltage than those noted above are considered distribution, rather than transmission, facilities. Entities with distribution facilities that are interested in interconnecting with CWLP should contact the Superintendent of Electric Transmission and Distribution—(217) 757-8520, ext. 2111— for more information.

 

1. Access the CWLP Transmission Interconnection Procedures.

Note: To open the Interconnection Procedures document, your computer will need to be equipped with Adobe Acrobat or Adobe Acrobat Reader. For a free download of the most recent version of Acrobat Reader, click on this icon: This is the Get Acrobat Reader logo. Clicking on it will take you to the Adobe website, where you'll be able to download a free copy of the latest version of Acrobat Reader.

2. Answer all applicable questions listed in Section 2 of the document.
3. Submit your application to CWLP:
by mail or
in person to:
CWLP Supervisor, Electric Planning
1008 E. Miller St.
Springfield, IL 62702
by FAX: (217) 789-2082
4. Once the CWLP Planning Department has reviewed your application, a CWLP representative will contact the person listed on the application to proceed forward with your request.