This is the top-of-the-page graphic for the Fiber Optics page. In addition to the page title, there is a large photo of hand holding fiber optic cables whose tips are glowing against a dark background.The graphic also contains a CWLP seal, and wording to identify the page as being part of the Electric Division section of the City Water, Light and Power website.










COMMENT? QUESTION? PROBLEM?
REPORT IT HERE



In 1993, CWLP began installing fiber to meet its internal needs for Supervisory Control and Data Acquisition (SCADA), load control and other current and future utility functions on a synchronous optical network (SONET) system. By 1996, CWLP was utilizing the fiber network for data and voice communications between our major facilities.

In 1997, an agreement between CWLP and Springfield School District 186 led to the installation of fiber, providing a 10 Mb Wide Area Network (WAN) service to 21 District 186 facilities. By late 1998, the School District’s need for increased bandwidths coincided with CWLP’s own growing need for higher-speed WAN connections. With the assistance of a federal grant obtained by District 186, CWLP was, in early 2000, able to install an OC-12 Asynchronous Transfer Mode (ATM) network that provides communication speeds in excess of 1 billion bits per second.

The ATM network runs on over 100 miles of previously installed fiber optic cable and is remotely monitored from CWLP’s network management center at the 10th and Miller Dispatch Center. This allows necessary changes to be made in a timely manner, usually without changes to any of the electronic equipment. The network is continually monitored by qualified network management personnel.

CWLP’s network provides multiple paths across the ATM backbone. The system is designed to provide a high level of redundancy, which, in turn, ensures a high level of system reliability. By providing multiple paths, the system can be rerouted around a single point in the event of a failure along one or more of the paths. In addition, critical sites can be dual connected to the network, providing even greater reliability.

The new ATM network far surpasses the current requirements of both CWLP and District 186. In fact, less than 5% of the system’s total capacity is utilized by these parties, which means the excess capabilities of the ATM network offer great potential to CWLP and the city of Springfield. As a result, the utility decided to take advantage of the Telecommunications Act of 1996, which allowed electric utilities to join the list of companies allowed to provide WAN and related bandwidth services on a commercial basis. The act also enables residential and small commercial customers to obtain competitive telecommunications services that previously had been available only to larger commercial and industrial customers. CWLP holds a Certificate of Authority from the Illinois Commerce Commission, allowing it to serve as a telecommunications provider.

Find out more about how CWLP provides commercial customer access to its fiber optic network.

 

 


 

This is the Twitter logo. Clicking on it will take you to CWLP's Twitter page. This is the Find Us on Facebook logo. Clicking on it will take you to CWLP's Facebook page.

 

Last update: 05/20/10

Power out? We're working to restore it. You can help. Click the yellow button to learn more.



This is CWLP's Smart Energy Forum logo. Clicking on it will take you to the Smart Energy Forum page.
We're working to make Springfield more energy efficient. You can help!



This is the American Public Power Association's Reliable Public Power Provider logo. Clicking on it will take you to a page that describes what CWLP is doing to earn the R P 3 award.
CWLP is an APPA
RP3 utility.




Planning a festival or other event requiring temporary electric service? You can start the Temporary Service application process online.




Need an electric service upgrade or service for a new construction proj-ect? You can start the Commercial Service application process online.



Make a comment.
Ask a question.
Report a problem.

Use our feedback form or send us an email. For electrical outages or emergencies, call 789-2121. For water outages or emergencies, call 789-2323.




Planning a landscaping or other digging project?
Call JULIE (Joint Utility Locating Information for Excavators) before you dig! Click here for details.



copyright 2010: City Water, Light & Power